30 Days Load Survey

A 30-day load survey is a method to measure and analyze a facility’s electrical load continuously over a month to determine maximum demand, ensure capacity, and facilitate safe, code-compliant electrical planning.

Purpose of a 30-Day Load Survey:

Load survey graph

A 30-day load survey is conducted to:

  • Determine the highest power demand in a facility, which is critical when adding new loads or upgrading electrical systems.
  • Verify that existing services and feeders can safely accommodate additional equipment without risk of overloading.
  • Provide accurate, real-world data for compliance with the NEC Section 220.87, which allows using actual load measurements when yearly utility data is unavailable.
  • Identify phase imbalances, peak loads, and energy trends, helping facility managers optimize power distribution and prevent electrical hazards.